Integrates with the stack you already run — low disruption, no rip-and-replace.
Integrates withRevit
Integrates withBluebeam
Integrates withNewforma
Personalized estimate
What could your firm save?
Based on $31K average cost per permit delay $31K average cost per permit delay (Dodge Construction Network, 2025). 6.5 months average permitting delay, U.S. AEC industry (National Association of Home Builders, 2024). and an estimated 35% reduction in delay exposure.
This estimate uses published industry delay benchmarks ($31K/permit delay, Dodge 2025; 6.5 mo average delay, NAHB 2024). It is not based on LA-specific or plinth.OS cohort data yet, and should be treated as a rough industry-context estimate — not a guaranteed or verified outcome.
Example: 12 permits/year at $8.00M average project value ≈ $137K estimated annual savings.
Estimated annual savings
Enter your numbers to see an estimate
Rough industry-context estimate (WA state $31K benchmark + projected reduction) — not a guaranteed or verified outcome.
Pricing
Three flat tiers — no success-fee layer
Flat subscription only — Starter free for eligibility and basic existing-building checks; Studio at $5,000/mo for Otto, CEQA exemption prep, hearing tracking, and ROI dashboard. No success-fee layer.
Tier 1
Starter
Eligibility screening, basic existing-building code check, 1 active project
Otto for existing-building, adaptive-reuse, and discretionary/site permits; CEQA exemption prep; hearing tracking; ROI dashboard; up to 5 active projects
$5,000/mo
Everything in Starter
Otto for existing-building, adaptive-reuse, and discretionary/site permits